Pasni Boathouse

Project Title:               Construction of Boat Storage Facility at Pasni for Maritime Security                                             Agency (MSA)
Client:                           CDM Smith, Inc. (US CENTCOM contractor)
Consultant:                 CDM-Smith-appointed consultant
Period:                          2011 - 2012
Astral Scope:               Prime Subcontractor;  Build to design
Brief Description:      Construction of Boat Storage Facility at Pasni including civil works,                                             infrastructure works and a large pre-fabricated facility. The project                                             consisted of construction of double-storey RCC office structure                                                   consisting septic tanks, underground and overhead water supply                                               tanks, generator room, watch tower (Picket), fuel tank, external                                                   development, transportation/erection/assembly of pre-engineered                                             steel structure building, crane steel structure/hoist/gantry and                                                   transportation/installation of generator etc at site.